![]() |
9:00 a.m.THURSDAY, JUNE 12, 2008
a. Briefing and update on Commissions FY07-08 Budget. (SMH-SF) 22. SANTA MONICA MOUNTAINS CONSERVANCY REPORT. 23. 24. EXECUTIVE DIRECTORS REPORT including report on legislation and water quality. a. b. c.
9:00 a.m.THURSDAY, JUNE 12, 20082. ROLL CALL.
SOUTH COAST DISTRICT - (Orange County)3. a. Application No. 5-06-399 (Samuel, Huntington Beach) Application of Emad Samuel to demolish boat dock and construct new U shaped boat dock. Proposed dock will consist of one 6 ft. by 50 ft. finger, one 9 ft. by 50 ft. finger, a 6 foot wide back walk, a 12 ft. by 14 ft. landing portion of the float, and a 17 ft. by 3 ft. gangway, at 16621 Carousel Lane, Huntington Beach, Orange County. (MV-LB) b. Application No. 5-08-116 (Yeager, Huntington Beach) Application of Frederick Yeager to add 15 linear ft. to concrete deck cantilevered 5 ft. beyond the bulkhead, resurfacing entire deck, and install 3 ft. high, tempered glass railing along edge of entire deck, at 3282 Falkland Circle, Huntington Beach, Orange County. (MV-LB) 4. a. Application No. 5-07-383 (Cefalia, Seal Beach) Application of Jim Cefalia to grade site and construct 5,259 sq. ft. two-story single-family home with basement, 557 sq. ft. attached two car garage on vacant beach front lot, with 3 stories on beach side and 2 stories on street side., at 450 Ocean Avenue, Seal Beach, Orange County. (FSY-LB) b. Application No. 5-07-438 (City Of Seal Beach, Seal Beach) Application of City of Seal Beach to replace decking on pier, at Seal Beach Municipal Pier, Seal Beach, Orange County. (FSY-LB)
SAN DIEGO COAST DISTRICT5. a. Application No. 6-08-34 (SD Co. Regional Airport Authority, San Diego) Application of San Diego County Regional Airport Authority to construct 1,777 sq.ft., 20-ft. high electrical switching station, at airport Terminal 2 Parking Lot, North Harbor Drive, San Diego, San Diego County. (DL-SD)
SOUTH COAST DISTRICT (Orange County)6. 7. 8. COASTAL PERMIT APPLICATIONS. See AGENDA CATEGORIES. Attention: Items appearing in this section of the agenda may be moved to the Consent Calendar for this area by the Executive Director when, prior to taking up the Consent Calendar, staff and the applicant are in agreement on the staff recommendation. If an item is moved to the Consent Calendar it will be processed in the same manner as other Consent Calendar items (See AGENDA CATEGORIES) except that if that item is subsequently removed from the Consent Calendar by a vote of three or more commissioners, the item will be acted upon at the meeting in the order in which it originally appears on this Meeting Notice and in the manner Coastal Permit Applications are processed. The purpose of this procedural change is to expedite the Commission's coastal development permit process. a. Application No. 5-07-327 (Richard Livoni Secord Family Limited Partnership, Newport Beach) Application of Richard Livoni Secord Family Limited Partnership to remove unpermitted retaining walls and beach access stairway from bluff face, re-grade lower bluff to natural contours, expand deck and construct additional new caisson-supported deck with enclosed bathroom and spa equipment room on upper bluff face, and construct new at grade pathway from new deck to beach, and associated grading, at 3335 Ocean Blvd., Newport Beach, Orange County. (FSY-LB) [POSTPONED]
SAN DIEGO COAST DISTRICT9. 10. 11. LOCAL COASTAL PROGRAMS (LCPs). See AGENDA CATEGORIES. a. 12. NEW APPEALS. See AGENDA CATEGORIES. a. Appeal No. A-6-CII-08-18 (Byrne, Carlsbad) Appeal by Commissioners Kruer & Wan from decision of City of Carlsbad granting permit with conditions to Richard Byrne to demolish wood stairs & construct concrete stairs, 130 sq. ft. concrete patio and retaining walls on coastal bluff face, at 5001 Tierra Del Oro, Carlsbad, San Diego County. (TR-SD) [POSTPONED] b. c. d. 13. COASTAL PERMIT APPLICATIONS. See AGENDA CATEGORIES. Attention: Items appearing in this section of the agenda may be moved to the Consent Calendar for this area by the Executive Director when, prior to taking up the Consent Calendar, staff and the applicant are in agreement on the staff recommendation. If an item is moved to the Consent Calendar it will be processed in the same manner as other Consent Calendar items (See AGENDA CATEGORIES) except that if that item is subsequently removed from the Consent Calendar by a vote of three or more commissioners, the item will be acted upon at the meeting in the order in which it originally appears on this Meeting Notice and in the manner Coastal Permit Applications are processed. The purpose of this procedural change is to expedite the Commission's coastal development permit process. a. Application No. 6-06-154 (Youth Tennis SD, San Diego) Application of Youth Tennis San Diego to add 4,400 sq. ft. one-story, 16 ft.-high education building to existing 11,515 sq. ft. clubhouse, relocate 9 parking spaces & construct 2 new paddle tennis courts on 13 acre lot containing existing tennis facility, at 4490 West Point Loma Boulevard, Ocean Beach, San Diego, San Diego County. (EL-SD) [moved to Consent Calendar] b. Application No. 6-07-3 (Mercurio, San Diego Co.) Application of Frank & Ruth Mercurio to demolish 2,114 sq.ft. 2-story home & detached storage sheds & construct 1-story, 5,445 sq.ft. home with attached 594 sq.ft. accessory dwelling unit, at 4866 Sun Valley Road, Lomas Santa Fe Vicinity, San Diego County. (DL-SD) [moved to Consent Calendar] c. d. Application No. 6-08-40 (Conc, LLC, Solana Beach) Application of Conc, LLC to demolish 1,255 sq. ft. home & various accessory buildings & construct 1-story, 2,459 sq. ft. restaurant building with 124 sq.ft. of patio dining and 1,484 sq. ft. mixed use retail and residential building (673.8 sq.ft. of retail and one-bedroom, 810 sq. ft. living unit) on 20,221 sq. ft. site, at 246 N. Cedros, Solana Beach, San Diego (DL-SD) [moved to Consent Calenar] 14. PERMIT AMENDMENTS. See AGENDA CATEGORIES. An Amendment below may be moved to the Consent Calendar for this area by the Executive Director when, prior to taking up the Consent Calendar, staff and the applicant are in agreement on the staff recommendation. If an item is moved to the Consent Calendar it will be processed like other Consent Calendar items (See above) except that if that item is subsequently removed from the Consent Calendar by a vote of 3 or more commissioners, the item will be acted upon at the meeting in the order in which it originally appears on this Meeting Notice and in the manner material amendments are processed. a. b.
ENERGY, OCEAN RESOURCES and FEDERAL CONSISTENCY15. 16. CONSENT CALENDAR (removed from Regular Calendar). See AGENDA CATEGORIES. 17. REVISED FINDINGS. See AGENDA CATEGORIES. a.
NORTH COAST DISTRICT18. 19. 20. LOCAL COASTAL PROGRAMS (LCPs). See AGENDA CATEGORIES. a. 21. COASTAL PERMIT APPLICATIONS. See AGENDA CATEGORIES. Attention: Items appearing in this section of the agenda may be moved to the Consent Calendar for this area by the Executive Director when, prior to taking up the Consent Calendar, staff and the applicant are in agreement on the staff recommendation. If an item is moved to the Consent Calendar it will be processed in the same manner as other Consent Calendar items (See AGENDA CATEGORIES) except that if that item is subsequently removed from the Consent Calendar by a vote of three or more commissioners, the item will be acted upon at the meeting in the order in which it originally appears on this Meeting Notice and in the manner Coastal Permit Applications are processed. The purpose of this procedural change is to expedite the Commission's coastal development permit process. a. Appeal No. A-1-MEN-05-29 (Phelps, Mendocino Co.) Appeal by Eric Beihl from decision of County of Mendocino granting permit with conditions to Charles & Dale Phelps to remove 1,805 sq. ft. home using portions for 621 sq. ft. workshop & 707 sq. ft. guest cottage & art studio. Construct 2,259 sq. ft. home & 672 sq. ft. detached garage with 625 sq. ft. porte cochere in between. Interior floor area equals 4,259 sq. ft. Maximum building height above average natural grade equals 21 ft.-5 in. Including LPG tank, generator, solar panels, new & relocated underground utility lines, stormwater infiltration pits, curtain drain, septic tank and leach field, additions to driveway, terrace, paths, utility screen fence, & dog pen, at 30250 South Highway One, Point Arena, Mendocino County. (TST-E) [moved to Conesent Calendar] b. Appeal No. A-1-DNC-06-37 (JHP, LLC, Del Norte Co.) Appeal by Friends of Del Norte from decision of County of Del Norte granting permit with conditions to JHP, LLC for planned community subdivision of 54-acre portion of 134-acre parcel into 70 lots ranging in size from 0.47-acre to 3.12 acres, at 2400 Lake Earl Drive, approximately 2 miles northeast of City of Crescent City, Del Norte County. (RSM-E) [POSTPONED] c. d. 22. PERMIT AMENDMENTS. See AGENDA CATEGORIES. An Amendment below may be moved to the Consent Calendar for this area by the Executive Director when, prior to taking up the Consent Calendar, staff and the applicant are in agreement on the staff recommendation. If an item is moved to the Consent Calendar it will be processed like other Consent Calendar items (See above) except that if that item is subsequently removed from the Consent Calendar by a vote of 3 or more commissioners, the item will be acted upon at the meeting in the order in which it originally appears on this Meeting Notice and in the manner material amendments are processed. a. b. Permit No. 1-86-200-A3 (Humboldt County Department of Public Works, Humboldt Co.) Request by Humboldt County Department of Public Works for shoulder widening and drainage improvements along approximately 0.22 mile stretch of Myrtle Avenue and improving Ryan Slough Bridge by performing minor widening, placing rock at west bridge abutment, and reconstructing storm drain outfall on bank of slough approximately 20 ft. north of bridge abutment, along Myrtle Avenue in vicinity of Ryan Slough Bridge, east of Eureka, Humboldt County. (MBK-E) [moved to Consent Calendar]
|